• AF 106 V1

AF 106 V1

$19,995.00


SKU:
Availability: In Stock

Product Details -

The AF 106 is a high-capacity industrial-grade transformer engineered by Billion Bison to deliver stable and efficient power conversion for mining farms and other high-load environments. With a rated capacity of 2500 kVA, this unit is ideal for large-scale deployments requiring reliable high-to-low voltage transformation.

Designed to meet EAC certification standards, the AF 106 is approved for use in Russia and Kazakhstan, ensuring regulatory compliance and operational safety in CIS power grids. 

Specifications +

  • Model: AF 106
  • Version: V1
  • Certification: EAC Certified
  • Applicable Regions: Russia, Kazakhstan
  • Rated Capacity: 2500 kVA
  • High Voltage Side Input: 10 kV
  • Low Voltage Side Output: 400 V

Built with durable materials and precision-engineered for harsh operating conditions, the AF 106 ensures continuous power stability for mission-critical operations like crypto mining, industrial automation, and data center infrastructure.

Shipping and Delivery +

Shipping Schedule: 

Orders are processed and shipped according to the specified delivery batch schedule. Standard dispatch times from the warehouse are typically within 1-3 business days. For bulk orders, please allow an additional 1-2 business days. We are committed to ensuring efficient and timely delivery for all our customers. While we strive to meet all estimated shipping dates, these timelines are indicative and subject to change based on operational factors.

 

Shipping Carriers: 

We partner with reputable courier services, including DHL, UPS, FedEx, TNT, and DDP dedicated lines, to guarantee secure and reliable shipping. Final carrier selection may vary depending on destination and service availability

 

Warehouse Locations: 

Our strategically positioned distribution centres in China and Hong Kong enable us to offer global coverage and prompt delivery. 

 

Delivery Timelines: 

International deliveries are usually completed within 5-8 business days. Deliveries to remote locations may take 8-10 business days, depending on the region. DDP shipping typically requires 8-12 business days, with timelines varying based on location and sea freight schedules. Delivery estimates are not guaranteed and may be affected by customs clearance, carrier scheduling, or unforeseen delays.

 

Customs Declarations: 

We can assist with customs declarations upon customer request to ensure smooth and efficient clearance processes. However, customers are ultimately responsible for understanding and complying with import regulations and duties in their respective countries unless DDP terms are explicitly agreed

 

Possible Causes for Delays:

Carrier Issues: Shipping delays may occur due to disruptions or logistical challenges experienced by couriers (e.g., DHL, FedEx) or other third-party carriers.  

 

Weather Conditions: Severe weather events, such as storms or natural disasters, can impact shipping routes and lead to delays.  

 

Supply Chain Delays: Delays may arise from issues within the supply chain, including delays from manufacturers or warehouses in processing or dispatching orders.  

 

Customer Notifications:

In the event of a delay, customers will be promptly notified via email, which will include an updated estimated delivery date.  Tracking information will be made available as soon as it is provided by the shipping carrier, enabling customers to track the progress of their shipments in real-time.  

 

Our Responsibility:

Once the goods are handed over to the designated shipping carrier, Billion Bison is no longer liable for any delays, damages, or losses resulting from the actions or performance of third-party logistics providers, customs clearance processes, or other external factors beyond our control. All delivery timelines provided are estimates and should not be considered binding commitments unless explicitly confirmed in a mutually signed agreement. 

 

Standard Packaging:

All mining hardware orders are packaged with adequate protective materials to prevent damage during transit.  

Each package is thoroughly inspected before shipment to ensure it adheres to carrier safety standards. While we strive to meet all estimated shipping dates, these timelines are indicative and subject to change based on operational factors

 

Power Supply Units and Cabling:
Unless otherwise specified in the product listing, mining hardware orders include the required power supply units (PSUs) and standard cabling for basic operation. If the manufacturer       includes the PSU or wires, we will deliver them as part of the shipment. If they are not provided by the manufacturer, customers are responsible for sourcing the power supplies and necessary cabling independently.

 

Reporting Damage:

If a package arrives with significant external damage, please notify the carrier immediately and contact us within 6 hours. Retain all packaging materials and provide photographic evidence to support your claim with the carrier. Failure to follow these steps may impact the processing of insurance or damage claims.

AF 106 V1

$19,995.00