• Supermicro SYS-421GE-TNHR2-LCC-G1 – Billion Bison

Supermicro HGX H200 Server 8U (AMD EPYC 9474F)

$294,692.00


SKU:
Availability: In Stock

Product Details -

Fully configured 8U HGX H200 8-GPU server. Ships with two 48-core AMD EPYC 9474F processors, 2.3TB of DDR5 and 8x H200 141GB — ready for LLM training and inference.

The Supermicro AS-8125GS-TNHR (Configuration OTO-2) is a high-performance 8U enterprise GPU server designed for artificial intelligence (AI), high-performance computing (HPC), generative AI, large language model (LLM) training, deep learning, and GPU-accelerated data center workloads.

Equipped with 8× NVIDIA H200 Tensor Core GPUs, dual AMD EPYC 9474F processors, and 2,304GB DDR5 ECC system memory, this server delivers powerful parallel computing capabilities for demanding enterprise and research applications.

Built on the NVIDIA HGX H200 architecture, the system features 1,128GB of HBM3e GPU memory, 4.8TB/s memory bandwidth per GPU, and high-speed NVIDIA NVLink and NVSwitch interconnect technology.

Available through Billion Bison Technologies, this system is suitable for enterprises, AI infrastructure providers, GPU cloud operators, research institutions, and organizations deploying scalable high-performance computing environments.

Prices are dynamic. Please confirm the latest price, configuration and availability with our team before ordering.

Specifications +

Supermicro AS-8125GS-TNHR – NVIDIA HGX H200 8-GPU AI Server

8× NVIDIA H200 GPUs | 1.128TB HBM3e GPU Memory | Dual AMD EPYC 9474F | 2.304TB DDR5 RAM | Enterprise AI & HPC

Key Features

  • 8× NVIDIA H200 Tensor Core GPUs: 141GB HBM3e memory per GPU
  • 1,128GB Total GPU Memory: High-capacity GPU memory for AI and HPC workloads
  • 4.8TB/s GPU Memory Bandwidth: Per NVIDIA H200 GPU
  • NVIDIA NVLink + NVSwitch: Up to 900GB/s GPU-to-GPU interconnect bandwidth
  • Dual AMD EPYC 9474F CPUs: 96 CPU cores and 192 threads combined
  • 2,304GB DDR5-4800 ECC RAM: Installed as 24× 96GB RDIMMs
  • Expandable System Memory: Up to 6TB
  • 960GB M.2 NVMe Boot Drive: PCIe 4.0 storage
  • High-Speed Storage: 12 NVMe bays and 2 SATA bays, with 4 additional optional NVMe bays
  • PCIe Gen5 Expansion: High-bandwidth connectivity with 1:1 GPU-to-NIC mapping
  • Redundant Power Supplies: 6× 3000W 80 PLUS Titanium, 3+3 redundancy
  • Enterprise Security: TPM 2.0 and Silicon Root of Trust
  • 8U Rackmount Chassis: Designed for demanding enterprise data centers

Technical Specifications

Specification

Details

Manufacturer

Supermicro

Model

AS-8125GS-TNHR

Configuration

OTO-2

Chassis

Supermicro 8U CSE-GP801TS

Motherboard

Supermicro H13DSG-O-CPU-D

Installed CPUs

2× AMD EPYC 9474F

CPU Cores

48 per CPU, 96 Total

CPU Threads

96 per CPU, 192 Total

Installed System Memory

2,304GB DDR5-4800 ECC RDIMM

Memory Configuration

24× 96GB

Maximum System Memory

Up to 6TB

GPU Platform

NVIDIA HGX H200

GPU Configuration

8× NVIDIA H200 Tensor Core GPUs

GPU Memory

141GB HBM3e per GPU

Total GPU Memory

1,128GB

GPU Memory Bandwidth

4.8TB/s per GPU

GPU Interconnect

NVIDIA NVLink + NVSwitch

GPU-to-GPU Bandwidth

Up to 900GB/s

Installed Boot Drive

960GB M.2 NVMe PCIe 4.0 SSD

Storage Bays

12× NVMe + 2× SATA Hot-Swap

Optional Storage

4 Additional NVMe Bays

Maximum Drive Bays

18 with Optional Expansion

PCIe Expansion

8× PCIe 5.0 x16 Low-Profile + 2× FHFL

Optional PCIe Configuration

8 Low-Profile + 4 Additional Slots

GPU Networking

1:1 GPU-to-NIC Connectivity

Security

TPM 2.0, Silicon Root of Trust

Power Supplies

6× 3000W 80 PLUS Titanium

Power Redundancy

3+3

Cooling

10 Heavy-Duty Hot-Swap Fans

Operating Temperature

10°C–35°C

Form Factor

8U Rackmount

Dimensions

437 × 355.6 × 843.28 mm

Net Weight

75.3 kg

Gross Weight

102.1 kg

Applications & Use Cases

Artificial Intelligence & Deep Learning

Accelerate AI model development, deep neural networks, computer vision, and advanced machine learning workloads using NVIDIA H200 GPU acceleration.

Large Language Model Training & Inference

Support LLM training, fine-tuning, inference, and generative AI applications with 1.128TB of high-bandwidth GPU memory.

High-Performance Computing (HPC)

Power scientific computing, complex engineering simulations, computational research, financial modeling, and large-scale parallel processing.

Enterprise AI Infrastructure

Deploy powerful GPU infrastructure for private AI environments, enterprise data centers, and accelerated computing clusters.

GPU Cloud & AI Hosting

Build GPU-as-a-Service (GPUaaS) platforms, AI hosting environments, and high-density GPU cloud infrastructure.

Research & Data Analytics

Support research institutions and data-intensive organizations with powerful multi-GPU computing and high-capacity system memory.

Why Choose Billion Bison Technologies?

Billion Bison Technologies supplies high-performance GPU servers, enterprise AI hardware, and advanced computing infrastructure for customers worldwide, subject to applicable trade regulations.

We support organizations seeking NVIDIA GPU computing solutions, AI server procurement, scalable HPC hardware, and international technology sourcing.

Our Solutions Include:

  • NVIDIA H200 and enterprise GPU server procurement
  • AI/HPC server and infrastructure sourcing
  • Multi-unit and bulk server quotations
  • GPU computing and data center hardware solutions
  • International shipping and logistics coordination
  • Export compliance documentation support
  • Enterprise technology procurement assistance

Ordering & Worldwide Shipping

Product: Supermicro AS-8125GS-TNHR – NVIDIA HGX H200 8-GPU Server

Configuration: OTO-2

Availability: Confirmed upon quotation

Lead Time: Subject to stock and order configuration

Shipping: Worldwide shipping options through DHL, UPS, or freight forwarding, where legally permitted

Import Duties & Taxes: Subject to destination-country customs regulations

Export Compliance: End-use and end-user certification must be completed before a quotation is issued. NVIDIA H200 systems are subject to export controls. Certain destinations, end users, and transactions may require export licences or may be prohibited.

Request a Quotation

Looking to purchase a Supermicro AS-8125GS-TNHR featuring 8× NVIDIA H200 GPUs, dual AMD EPYC 9474F processors, and 2.304TB DDR5 ECC RAM?

Contact Billion Bison Technologies for competitive quotations, hardware specifications, availability, ordering requirements, and international delivery options.

BILLION BISON TECHNOLOGIES

Empowering Blockchain Innovation | AI Infrastructure | GPU & HPC Solutions

Shipping and Delivery +

Shipping policy

Shipping Schedule: 

Orders are processed and shipped according to the specified delivery batch schedule. Standard dispatch times from the warehouse are typically within 1-3 business days. For bulk orders, please allow an additional 1-2 business days. We are committed to ensuring efficient and timely delivery for all our customers. While we strive to meet all estimated shipping dates, these timelines are indicative and subject to change based on operational factors.

 

Shipping Carriers: 

We partner with reputable courier services, including DHL, UPS, FedEx, TNT, and DDP dedicated lines, to guarantee secure and reliable shipping. Final carrier selection may vary depending on destination and service availability

 

Warehouse Locations: 

Our strategically positioned distribution centres in China and Hong Kong enable us to offer global coverage and prompt delivery. 

 

Delivery Timelines: 

International deliveries are usually completed within 5-8 business days. Deliveries to remote locations may take 8-10 business days, depending on the region. DDP shipping typically requires 8-12 business days, with timelines varying based on location and sea freight schedules. Delivery estimates are not guaranteed and may be affected by customs clearance, carrier scheduling, or unforeseen delays.

 

Customs Declarations: 

We can assist with customs declarations upon customer request to ensure smooth and efficient clearance processes. However, customers are ultimately responsible for understanding and complying with import regulations and duties in their respective countries unless DDP terms are explicitly agreed

 

 Shipping Delays and Notifications

Possible Causes for Delays:

  • Carrier Issues: Shipping delays may occur due to disruptions or logistical challenges experienced by couriers (e.g., DHL, FedEx) or other third-party carriers.  
  • Weather Conditions: Severe weather events, such as storms or natural disasters, can impact shipping routes and lead to delays.  
  • Supply Chain Delays: Delays may arise from issues within the supply chain, including delays from manufacturers or warehouses in processing or dispatching orders.  

 

Customer Notifications:

In the event of a delay, customers will be promptly notified via email, which will include an updated estimated delivery date.  Tracking information will be made available as soon as it is provided by the shipping carrier, enabling customers to track the progress of their shipments in real-time.  

 

Our Responsibility:

Once the goods are handed over to the designated shipping carrier, Billion Bison is no longer liable for any delays, damages, or losses resulting from the actions or performance of third-party logistics providers, customs clearance processes, or other external factors beyond our control. All delivery timelines provided are estimates and should not be considered binding commitments unless explicitly confirmed in a mutually signed agreement. 

 

 

Packaging

Standard Packaging:

All mining hardware orders are packaged with adequate protective materials to prevent damage during transit. Each package is thoroughly inspected before shipment to ensure it adheres to carrier safety standards. While we strive to meet all estimated shipping dates, these timelines are indicative and subject to change based on operational factors

 

Power Supply Units and Cabling:
Unless otherwise specified in the product listing, mining hardware orders include the required power supply units (PSUs) and standard cabling for basic operation. If the manufacturer includes the PSU or wires, we will deliver them as part of the shipment. If they are not provided by the manufacturer, customers are responsible for sourcing the power supplies and necessary cabling independently.

 

Reporting Damage:

If a package arrives with significant external damage, please notify the carrier immediately and contact us within 6 hours. Retain all packaging materials and provide photographic evidence to support your claim with the carrier. Failure to follow these steps may impact the processing of insurance or damage claims.

 

Supermicro HGX H200 Server 8U (AMD EPYC 9474F)

$294,692.00